The work is to be broken down into 4 parts. • The existing pool filters are to be removed and be replaced with new ones. This is to be design by a pool specialist. A section of the flat roof will require removal and reinstating to allow for the supply of the new filters. • The existing boilers are to be removed and replaced with new boilers, flues, control modifications and shunt pumps. • The main pool hall air handling unit is to be removed and replaced with new. The air handling units are currently screened off with a louvre. This is to be replaced with new and the flat roofs and wall replaced/repaired. • The male and female changing rooms are to be refreshed. (ie in principle items stay in same location but are replaced with new) Works includes white rock to some walls, new locker doors, new toilets, showers, wash hand basins, cubicles, suspended ceiling and lighting. As a guide a changing room includes 6 changing cubicles, 3 wc
02/12/2024 13:00:00
45351000-2 Mechanical engineering installation works
45350000-5 Mechanical installations
71333000-1 Mechanical engineering services
71334000-8 Mechanical and electrical engineering services
Notice | Date of dispatch |
---|---|
Awarded Contract (Contracts Finder) | 09/01/2025 13:10 |