The works is a heating distribution replacement scheme to the tower block at Spen Valley High School which includes. The replacement of column radiators with modern steel panel radiators. The existing radiators have very limited control at the moment as they are on one pipe system. The aim of the scheme is to extend the one pipe system to create a two pipe system with new radiators and TRVs. The scheme includes work to 12 class room areas. CONTACTS Name
08/07/2024 13:00:00
45351000-2 Mechanical engineering installation works
45350000-5 Mechanical installations
71333000-1 Mechanical engineering services
71334000-8 Mechanical and electrical engineering services
Notice | Date of dispatch |
---|---|
Awarded Contract (Contracts Finder) | 22/07/2024 12:38 |