The project involves the construction of individual sections of natural stone slab surfacing along a permissive footpath running across the Eastern Peak District Moors. The final layout of the stone slabs will be Contractor designed. There is no direct vehicular access to the work areas, but potential air lift locations are identified. All works must be carried out by hand.

01/07/2024 12:00:00

45233161-5  Footpath construction work
44910000-2  Stone for construction
45262510-9  Stonework
45454100-5  Restoration work