Landscape Works at Walliker & Perry Street – Reduced Scheme

[EndedMessage]

The works are the removal of the two existing car park areas and the construction of two low swale areas to improve local flood resilience. The Contractor will seed newly landscaped areas with wildflower seed.

08.12.2023 12:00:00

45000000-7  [46346]


Hull City Council
The Guildhall, Alfred Gelder Street
HU1 2AA
Hull
[GB]
[ViewProfile]


https://www.hull.gov.uk/

[PublishedNotices]
[CF03Award] ([ContractsFinderV2]) 16.04.2025 10:39
[Packages]
Landscape Works at Walliker & Perry Street – Reduced Scheme
[AdditionalInfo]:
[Documents] [Documents]
[Close]