Replacement of the existing heating boilers within the plant room, along with associated flue systems and pipe work connections to the existing, retained headers and pumps. Installation of new gas pipe work, automatic controls, related electrical requirements and builder’s work.
31/07/2023 13:00:00
45351000-2 [47095]
45350000-5 [47094]
71333000-1 [48160]
| [Notice] | [DispatchDate] |
|---|---|
| [CF03Award] ([ContractsFinderV2]) | 05/09/2023 13:14 |