Design and construction of a new outdoor exercise facility at Beverley Leisure Centre. Two thirds of the site will consist of the installation of bespoke containers and workout rigs with a branded canopy, plus additional containers, and static equipment with appropriate flooring material, designed. The remaining third will be re-surfaced and re-lined as a MUGA pitch. All fencing to the MUGA pitch is to be removed and replaced.
12/07/2023 12:00:00
45000000-7 Construction work
East Riding of Yorkshire Council
County Hall, Cross Street,
HU17 9BA
Beverley
United Kingdom
View profile
Notice | Date of dispatch |
---|---|
Awarded Contract (Contracts Finder) | 03/10/2023 16:49 |