Area 2 - A170 Sutton Bank 2023 Rock Face Maintenance

The quote/tender has ended, you cannot answer the invitation.

The proposed Sutton Bank 2023 annual maintenance works include: 1. completion of the annual rock slope inspection of Upper Slope, Mid Slope and Lower slope and Cragg House slope by WSP engineer. 2. Clear vegetation and complete general scaling works from crest to the toe of the upper and lower rock face. 3. Routine maintenance of rock mesh / bolts to be undertaken, for example the removal of rock debris which accumulates in excess of 0.75m per metre run of mesh. 4. Inspection of 2022 remedial works to determine if advanced corrosion of any components is occurring.

15/06/2023 12:00:00

45200000-9  Works for complete or part construction and civil engineering wo


The North Yorkshire Council
County Hall, Racecourse Lane,
DL7 8AD
Northallerton
United Kingdom
View profile


https://www.northyorks.gov.uk

Published notices
Live Opportunity (Contracts Finder) 10/05/2023 14:17
Awarded Contract (Contracts Finder) 24/10/2023 17:09
Lots
Area 2 - A170 Sutton Bank 2023 Rock Face Maintenance
Additional information:
Documents Documents
Close