There are multiple areas where existing timber log retaining walls are failing on site. The proposal is to remediate these areas by removing the defective sections and replace with steel piles connected by composite plastic infill panels. Certain areas where the existing log walls are of insignificant height will be re-graded. In one existing Weldmesh fencing will be adapted.
26/05/2023 12:00:00
45262620-3 Supporting walls
Sheffield City Council
Town Hall, Pinstone Street,
S1 2HH
Sheffield
United Kingdom
View profile
Notice | Date of dispatch |
---|---|
Live Opportunity (Contracts Finder) | 27/04/2023 15:15 |