The current timber decking along Hornsea seafront has been identified as in a state of repair due to the environment and ERYC vehicles driving over the decking, which the decking is unable to support resulting in its failure. The areas of the decking only available for access by pedestrians will be replaced with a composite decking material along with the subframe and base being replaced. In the areas where ERYC vehicles are driving over the timber decking the decking will be completely replaced with a hard-wearing construction material able to withstand the loadings. Such as: Marshalls Drivesett Savanna Block Paving.
03/03/2023 12:00:00
45000000-7 Construction work
East Riding of Yorkshire Council
County Hall, Cross Street,
HU17 9BA
Beverley
United Kingdom
View profile
Notice | Date of dispatch |
---|---|
Awarded Contract (Contracts Finder) | 09/05/2023 11:47 |