Ground Source Heat Pumps Phase 5

The quote/tender has ended, you cannot answer the invitation.

Ground Source Heat Pumps Phase 5. Remove the existing electric storage heating system and replace it with a Ground Source Heat Pump (GSHP) system and hot water including wet radiators. There will be between 15 and 17 high rise blocks in total highlighted to receive this new heating and hot water GSHP system. 12 of these blocks require sprinklers to be installed. The blocks are grouped by area and the order of the blocks to receive the work is not confirmed yet.

25/07/2022 16:00:00

44163112-8  Drainage system
44163110-4  Drainage pipes


Leeds City Council
Civic Hall, 3rd Floor West,
LS1 1UR
Leeds
United Kingdom
View profile


https://www.leeds.gov.uk/

Published notices
Live Opportunity (Contracts Finder) 11/07/2022 09:03
Lots
Ground Source Heat Pumps Phase 5
Additional information:
Documents Documents
Close