The enclosed opportunity is for the resurfaccing on the Station Road, Carcroft Scheme that is to take place between 25th July 2022 to 21st August 2022 in phased working that is identified in the design drawings. The closing date for this opportunity is the 15th July 2022 at 12 noon.