Easby Abbey Ditching

The quote/tender has ended, you cannot answer the invitation.

Ditch reprofiling work is to be undertaken over an approximate length of 80m to set levels provided by the Principal Designer. There is also some vegetation clearance to be carried out. The location for the pipe outfall is to be moved to the bottom of the slope. Associated works include dismantling the stonework and cobbles from the previously constructed headwall and set aside for reuse at the bottom of the slope. Remove concrete base. Lay additional 12m length of 300mm dia. pipe on Type S bedding material with 550mm minimum depth to the pipe soffit. Construct new headwall at bottom of slope.

06/05/2022 12:00:00

45111240-2  Ground-drainage work


The North Yorkshire Council
County Hall, Racecourse Lane,
DL7 8AD
Northallerton
United Kingdom
View profile


https://www.northyorks.gov.uk

Published notices
Awarded Contract (Contracts Finder) 29/06/2022 10:08
Lots
Lot 1 £0k-£500k - North Yorkshire & York
Additional information:
Documents Documents
Close