Oxspring Primary School - Roofing Works

[EndedMessage]

Removal of the existing roof covering over the school hall to replace the existing breathable roof membrane with a non-breathable roof membrane (bat friendly). Installation of internal bat exclusion at eaves / verges and bat boxes in accordance with Natural England Work Schedule and Brooks Ecological guidance.

06.05.2022 12:00:00

45260000-7  [46944]


Barnsley Metropolitan Borough Council
Town Hall
S70 2TA
Barnsley, South Yorkshire
[GB]
[ViewProfile]


https://www.barnsley.gov.uk

[PublishedNotices]
[CF02LiveOpportunity] ([ContractsFinderV2]) 29.03.2022 14:21
[CF03Award] ([ContractsFinderV2]) 20.06.2022 10:32
[Packages]
Oxspring Primary School - Roofing Works

Removal of the existing roof covering over the school hall to replace the existing breathable roof membrane with a non-breathable roof membrane (bat friendly). Installation of internal bat exclusion at eaves / verges and bat boxes in accordance with Natural England Work Schedule and Brooks Ecological guidance.

[AdditionalInfo]:
[Documents] [Documents]
[Close]