T/AW288/21 - H3AT – Pressure Vessels

[EndedMessage]

UKAEA wishes to engage with potential prime contractors, SME’s, pressure vessel designers and manufacturers for the supply of vessels in a variety of volumes. Approximately twenty-six vessels will be required. This is subject to preliminary and detailed engineering design phases, numbers may increase or decrease. These vessels will be for use in a number of sub-systems that will make up the Tritium Plant located within the new H3AT Facility currently in construction on the UKAEA Culham site. There will be two main types of vessel: single containment and dual containment. Vessels will be required to be taken through design analysis, manufacture, testing and then delivery to UKAEA’s site in Culham.

[Supplies]

2022-01-31 12:00:00

44610000-9  [46240]
44615000-4  [46267]
44615100-5  [46268]
45255400-3  [46931]
45262670-8  [47009]
45262680-1  [47010]
71300000-1  [48097]
71320000-7  [48137]
71323000-8  [48149]
71330000-0  [48157]
71333000-1  [48160]
71335000-5  [48162]
71336000-2  [48163]
71340000-3  [48165]
71350000-6  [48166]
72242000-3  [48428]
73430000-5  [48531]
09343000-5  [40323]


UK Atomic Energy Authority
Culham Science Centre
OX14 3DB
Oxfordshire
[GB]
[ViewProfile]


https://www.gov.uk/government/organisations/uk-atomic-energy-authority

[PublishedNotices]
[FtsS09F01PriorInformationNotice] ([FTS])
[Packages]
H3AT – Pressure Vessels
[AdditionalInfo]:
[Documents] [Documents]
[Close]