This scheme consists of excavating the grassed area to both sides of the carriageway down to the hammerhead at the bottom of the street. Excavation will be to a depth of 0.450mm and replaced with full tarmac construction. There will also be new full height kerbs installed to a new perimeter line, additional road gully’s installed, ironworks, topsoiling/seeding and Planing (Milling) of the existing carriageway so it can be replaced with new.
22/12/2021 12:00:00
45200000-9 Works for complete or part construction and civil engineering wo
East Riding of Yorkshire Council
County Hall, Cross Street,
HU17 9BA
Beverley
United Kingdom
View profile
Notice | Date of dispatch |
---|---|
Awarded Contract (Contracts Finder) | 12/04/2022 16:15 |