UKAEA wishes to engage with potential prime contractors, SME’s, fume cupboards manufacturers for the development and supply of 6 fume cupboards for use in a new building onsite at the Culham Centre for Fusion Energy which is currently under construction, called the National Fusion Technology Platform. This building will house the Tritium Advanced Technology (H3AT) laboratories for Health Physics, Wet Chemistry and Materials Detritiation. A need for a number of fume cupboards and extraction units has been identified, as follows. A. 1 off bespoke fume cabinet 1 (detailed below) B. 1 off bespoke fume cabinet 2 (detailed below) C. 4 off sash fume cupboards with a working area of approximately W 1.00 x D 0.63 x H 1.17 m D. 3 off elephant trunk fume hoods (1 for each laboratory) Through this process we are looking to open up engagement with suppliers to ensure there is sufficient production capability and capacity to meet project timelines and design requirements. After the engagement exercise, UKAEA intend to issue an Invitation to Tender through the EU Supply and Find a Tender portal to procure services for design, provision of equipment and installation work through competitively tendered contracts.
Supplies
08/11/2021 12:00:00
71320000-7 Engineering design services
71900000-7 Laboratory services
45351000-2 Mechanical engineering installation works
UK Atomic Energy Authority
Culham Science Centre
OX14 3DB
Oxfordshire
United Kingdom
View profile
https://www.gov.uk/government/organisations/uk-atomic-energy-authority
Notice | Date of dispatch |
---|---|
Prior information notice (FTS) |