T/AS091/20 - Replacement of the D12 and F2 Switchgear at Culham Science Centre

[EndedMessage]

The majority of the equipment in the Culham West Main LV Distribution switchrooms D12 & F2 is approximately 60 years old and is long passed its intended design life.The scope includes but shall not be limited to: Replace the 60 years old English Electric LV ACBs in the switch panels with a retrofit withdrawable solution with equivalent Form 4 Type 7 ACBs in the two separate switchrooms in D12 and in the single switchroom in F2; The new ACBs must match the ratings from the obsolete ACBs and must provide like-for-like protection with adjustable settings; The retrofit solutions shall meet modern day safety standards; Introduction of intelligent monitoring of electrical loads; power demand and quality with real-time meter readings via networked PCs; and The retrofit solution must have a minimum lifetime of 25 years.

[Works]

9-12-2020 12:00:00

31214000-9  [42168]
31000000-6  [42087]
31210000-1  [42148]
31220000-4  [42192]
45310000-3  [47017]
45311000-0  [47018]
45311100-1  [47019]
45311200-2  [47020]
45315100-9  [47041]
50116100-2  [47389]
50710000-5  [47564]
51100000-3  [47591]
51110000-6  [47592]
71314100-3  [48118]


UK Atomic Energy Authority
Culham Science Centre
OX14 3DB
Oxfordshire
[GB]
[ViewProfile]


https://www.gov.uk/government/organisations/uk-atomic-energy-authority

[PublishedNotices]
[CF02LiveOpportunity] ([ContractsFinderV2])
[CF03Award] ([ContractsFinderV2]) 14-4-2021 09:00
[Packages]
Replacement of the D12 and F2 Switchgear at Culham Science Centre
[AdditionalInfo]:
[Documents] [Documents]
[Close]