The overarching requirement of the project is to develop the RIBA Stage 3 Design into a complete RIBA Stage 4 Technical Design and subsequently build and commission the new Central Substation building (through RIBA Stage 5 and 6). This project is split into two principal Phases as outlined below – a Design Phase (1) and a Build Phase (2), each with their own corresponding Work Packages. In summary, this Project includes the following work packages: Project Phase 1 (Design) includes the following work packages: • WP 1: Survey and assessment work to facilitate the RIBA 4 design. • WP 2: RIBA 4 Technical Design incl. all temporary works designs. • WP 3: Undertake earthing design for Central Substation. Project Phase 2 (Build) includes the following work package: • WP 4: RIBA 5 and 6: Construct, Commission and Handover the works as designed in Phase 1. Installation of HV/LV Electrical switch panels and associated cabling shall not form part of this work, and will follow as a separate project once WP 4 is complete.
27/03/2026 15:00:00
45000000-7 Construction work
45100000-8 Site preparation work
45200000-9 Works for complete or part construction and civil engineering wo
45300000-0 Building installation work
KBS Maritime Ltd
Victory Building, Room 233, The Parade, HM Naval Base
PO1 3LS
Portsmouth
United Kingdom
View profile
| Notice | Date of dispatch |
|---|---|
| Live Opportunity (Contracts Finder) | 25/02/2026 11:00 |