Falmouth Exeter Plus (FXPlus) is looking to appoint a single supply partner to carry out the decarbonisation project for SERFS and Stella Turk buildings at the Penryn Campus, Penryn. The work will include;- Design and install ASHP heating system as per option 1 of feasibility study included in supporting documentation. Ensure integration with existing heating system. Provide certificate of compliance, O&M manuals and method to demonstrate energy savings upon completion. Decommissioning of existing gas-powered boilers.
05/07/2024 12:00:00
51100000-3 Installation services of electrical and mechanical equipment
39715200-9 Heating equipment
Falmouth Exeter Plus
Penryn Campus
TR10 9FE
Penryn, Cornwall
United Kingdom
View profile
Notice | Date of dispatch |
---|---|
Live Opportunity (Contracts Finder) | 31/05/2024 14:08 |
Contract notice (FTS) |