The Contracting Authority intends to build a modular, mobile, containerised mineral processing plant (throughput: 5TPH) that is rapidly deployable, even in difficult terrain, without substantial infrastructure development costs.The following items shall be in the scope of obligations of the Contractor: 1) All shop & as-built (record) drawings for all sections of the Plant (including: comminution & classification, ore-sorting, jigging, spiralling & tabling, and flotation). The Contractor shall prepare and submit to the Contracting Authority such drawings and documents as being specified in the Annex 3. 2) The engineering, construction and cold-commissioning (off-site test) phases of the jigging section of the Plant with nominal capacity of 5 TPH (throughput). 3) The engineering, construction and cold-commissioning (off-site test) phases of the ore-sorting section of the Plant with nominal capacity of 1.5 – 2 TPH (throughput). 4) The engineering, construction and cold-commissioning (off-site test) phases of the spiralling & tabling section of the Plant with nominal capacity up to 2 TPH (throughput).
Services
15/05/2018 12:00:00
45250000-4 Construction works for plants, mining and manufacturing and for
| Notice | Date of dispatch |
|---|---|
| Live Opportunity (Contracts Finder) | 19/04/2018 10:01 |
| Awarded Contract (Contracts Finder) | 27/09/2018 12:31 |