| Publicly Available Documents | Size (kB) |
| Only Available after Expression of Interest |
| 20230901 50391w0002 Stage 1 Report - UoP Smeaton.pdf |
| 2357_P_003_Existing plans-Default-000.pdf |
| 2357_P_004_Existing Elevations-Default-000.pdf |
| 2357_P_005_Proposed plans-Default-000.pdf |
| 2357_P_006_Proposed elevations-Default-000.pdf |
| 2357_P_007_Proposed elevations context-Default-000.pdf |
| 2357_T_10.10_Ground floor FFE-Default-000.pdf |
| 2357_T_10.11_First floor FFE-Default-000.pdf |
| 240116 - UoP Smeaton - Fire Strategy Comments.pdf |
| Appendix A1 - Supplier Quality Response- Brunel Decant .xlsx |
| Asbestos Re-inspection Report Smeaton, 18 Drake Circus.pdf |
| Asbestos Survey Report-Smeaton, 18 Drake Circus (M).pdf |
| Asset and Location Uploader Template Client.xlsx |
| BE-COP-001 High Voltage Systems.pdf |
| BE-COP-002 Water Hygiene.pdf |
| BE-COP-003 Permit to Work.pdf |
| BE-COP-005 Site Rules and Conditions.pdf |
| BE-COP-006 Portable Appliance Testing.pdf |
| BE-COP-007 Low Voltage v2.0.pdf |
| BE-COP-008 Management of Contractors.pdf |
| BE-COP-009 Management of Passenger and Goods Lifts.pdf |
| BE-COP-010 Working at Height.pdf |
| BE-COP-011 Confined Spaces.pdf |
| BE-COP-012 Dig Safely.pdf |
| BE-PLN-002 Asbestos Operational Plan.pdf |
| BE-PLN-003 Asbestos Management Plan.pdf |
| BE-POL-001 Asbestos Policy.pdf |
| CCL Seaton Validation Site report.pdf |
| CD-PLN-001 CDM Management and Operational Plan.pdf |
| CD-POL-001 CDM Policy.pdf |
| Certification Required by Maintenance on PC.docx |
| Contractor_Consultant-induction-checklist.doc |
| FW UoP - Matterport Scan Project Links - Smeaton for Brunel Decant .msg |
| Handover & Acceptance Checklist Rev 1.docx |
| Induction info.docx |
| ITT Brunel decant SMB works.docx |
| LTHW VT.pdf |
| Master list of maintenance tasks with Bar Code Locations.docx |
| OCRA RS1a Report.pdf |
| P0665 UoP - Brunel Smeaton Decant Stg 1 - Rev P1.pdf |
| Site Rules and Conditions - Version 11.docx |
| SMB_8726 - R&D Survey.pdf |
| Smeaton 001E Supply Fan.jpg |
| Smeaton 002A Extract unit.jpg |
| Smeaton 002C Supply Fan.jpg |
| Smeaton 004 Supply fan 1.jpg |
| Smeaton 004 Supply Fan 2.jpg |
| Smeaton 004 Unit 2 inlet duct.jpg |
| Smeaton Cold Water connection in WC to room 002,.jpg |
| Smeaton Cold water connection to Room 002 in WC void.jpg |
| Smeaton Grd Fl. West Riser.jpg |
| Smeaton Grd. Fl. VT Pumps.jpg |
| Smeaton Grd. Fl. VT System PRV in Plantroom.jpg |
| Smeaton L1 West Riser LL header Pumps.jpg |
| Smeaton L1 West Riser LL Header.jpg |
| Smeaton SMB 004 VT pipework blanked in corridor.jpg |
| Smeaton SMB.jpg |
| Smeaton SMB002C Supply Fan inlet not inline with the Fan inlet so recirculaion possible!.jpg |
| Smeaton SMB004 Supply unit Filter.jpg |
| Smeaton Typical supply unit inlet..jpg |
| Smeaton VT System Water Vented from CS valves on Ground Floor.jpg |
| TIS Infrastructure Design Specification V7.2.pdf |
| UoP Brunel Decant - JCT ICwCD Preliminaries v.2.pdf |
| UoP Brunel Decant_Smeaton Building_Tender Brief.docx |
| UoP Design Guide.pdf |
| UoP Smeaton - Demo Markup.pdf |
| UoP Smeaton - PCSA Contractor Duties.docx |
| UoP Smeaton_PCSA.pdf |
| UoP_BDSB_Pricing Schedule.xlsx |