| Publicly Available Documents | Size (kB) |
| Only Available after Expression of Interest |
| ~$Hepworth Arcade - 3D Scan to BIM Request Form.xlsx |
| 1 - 1995 Plaque.jpg |
| 1. Contract Data Part 1 v.1.docx |
| 1. ITT - Part 1 Hepworth's Arcade MDT REV A.docx |
| 1. ITT - Part 2 Hepworth's Arcade MDT.docx |
| 10 - Stonework damage at floor.jpg |
| 10. Appendix 1.8 - Register - HS349723.pdf |
| 106730-NPS-XX-DR-A-(SK)002 P1 - Existing Below Ground Service Duct.pdf |
| 106730-NPS-XX-DR-A-(SK)003 P1 - Existing Ground Floor Plan.pdf |
| 106730-NPS-XX-DR-A-(SK)004 P1 - Existing First Floor Plan.pdf |
| 11 - Floor tiling repairs.jpg |
| 11. Appendix 1.9 - DRAFT Conservation Management Plan.pdf |
| 114614-HA01 Scope of Building Surveys.pdf |
| 114614-HA02 3D Scan to BIM Request Form.pdf |
| 114614-HA03 Survey Extent Drawings.pdf |
| 12 - Gate and fanlight view.jpg |
| 12. Appendix 1.10 - Condition Survey.pdf |
| 13 - Floor tiling detail.jpg |
| 13. Appendix 1.11 - Paint Analysis Report.pdf |
| 14 - High level balcony detail.jpg |
| 14. Appendix 1.12 - Building Plans.pdf |
| 15 - High level detailing.jpg |
| 15. Appendix 1.13 - Asbestos Management Plan 2023.pdf |
| 16 - Column Base.jpg |
| 16. Appendix 1.14 - Hull History Centre Archive Material List.docx |
| 17 - Column Head.jpg |
| 17. Appendix 1.15 - Hepworth 2020 Roof Refurbishment Photograph List.docx |
| 18 - Trinity Market Link.jpg |
| 18. Appendix 1.16 - Drainage Survey 2018 Archive List.docx |
| 19 - Paving to Trinity Market Link.jpg |
| 19. Appendix 1.17 - Hepworth 2015 Floor Duct Investigation Document List.docx |
| 2 - Stonework Damage.jpg |
| 2. Appendix 1 - Scope v.1.docx |
| 2. Example Form of Agreement.doc |
| 2. Selection Questionnaire.docx |
| 20 - General Arcade Floor.jpg |
| 20. Appendix 1.18 - Scope for Surveys List.docx |
| 21 - Mural.jpg |
| 21. Appendix 1.19 - DRAFT SE-DT-Hepworth P2 Scoping Report (2020).pdf |
| 22 - Door Fanlight and Ceiling Soffit.jpg |
| 22. Appendix 1.20 - Retail Unit Asbestos Summary & Information List V1.docx |
| 23 - High level paint defect to plasterwork.jpg |
| 23. Appendix 1.21 - Site Location Plan.pdf |
| 24 - First Floor Window example.jpg |
| 24. Appendix 1.22 - RIBA Plan of Work.pdf |
| 25 - Archway and Inscriptions.jpg |
| 25. Appendix 1.23 - X4-Ultimate Holding Guarantee Template.rtf |
| 26 - Friable stonework.jpg |
| 26. Appendix 1.24 - X8 Collateral Warranty Template Services.docx |
| 27 - Damaged low level stonework.jpg |
| 27. Appendix 1.25 - X8 Collateral Warranty Template for Stone Survey.docx |
| 28 - Friable stonework detail.jpg |
| 28. Appendix 1.26 - X13 - Example Performance Bond Form.doc |
| 29 - FF Window reveal flaking paintwork.jpg |
| 29. Appendix 2 - Additional Conditions of Contract v.1.docx |
| 3 - Damage to painted profile.jpg |
| 3. Appendix 1.1 - Historic England Guidance for Applicants.pdf |
| 3. Schedule 1 - The Prices Preamble.docx |
| 30 - Flaking Soffit.jpg |
| 31 - Gate Fanlight.jpg |
| 32 - Gate remedial fixing.jpg |
| 33 - Arcade Floor Threshold.jpg |
| 34 - High Level Features.jpg |
| 35 - High Level Cornice.jpg |
| 36 - Friable stonework detail 2.jpg |
| 37 - Painted Archway detail.jpg |
| 38 - Gate Base.jpg |
| 39 - Door Fanlight.jpg |
| 4 - Stonework Column detail.jpg |
| 4. Appendix 1.2 - Historic England Blank Application Form.pdf |
| 4. Schedule 1 - Contract Sum Analysis.xlsx |
| 5 - Rounded profile and paintwork.jpg |
| 5. Appendix 1.3 - HE Maintenance Plan Guidance.pdf |
| 6 - Column head paintwork.jpg |
| 6. Appendix 1.4 - HE Grant Recipients Guidance.pdf |
| 6. Contract Data Part 2.rtf |
| 7 - High Level paintwork.jpg |
| 7. Appendix 1.5 - HE Repair Grant Application Completed.pdf |
| 8 - Shop front vent detail.jpg |
| 8. Appendix 1.6 - Listing Entry.pdf |
| 9 - Shop front service entry detail.jpg |
| 9. Appendix 1.7 - Title Plan- HS349723.pdf |
| AMP_Asbestos_Exec_Summary_HEP000.pdf |
| AMP_Asbestos_Exec_Summary_HEP001.pdf |
| AMP_Asbestos_Exec_Summary_HEP004.pdf |
| AMP_Asbestos_Exec_Summary_HEP005.pdf |
| AMP_Asbestos_Exec_Summary_HEP006.pdf |
| AMP_Asbestos_Exec_Summary_HEP007.pdf |
| AMP_Asbestos_Exec_Summary_HEP008.pdf |
| AMP_Asbestos_Exec_Summary_HEP009.pdf |
| AMP_Asbestos_Exec_Summary_HEP011.pdf |
| AMP_Asbestos_Exec_Summary_HEP012.pdf |
| AMP_Asbestos_Exec_Summary_HEP013.pdf |
| AMP_Asbestos_Exec_Summary_HEP014.pdf |
| AMP_Asbestos_Exec_Summary_MAR021.pdf |
| AMP_Asbestos_Exec_Summary_MAR022.pdf |
| AMP_Asbestos_Exec_Summary_SIL002.pdf |
| Arcade Frontage Extract Original Drawings.jpg |
| Basement Plan Extract Original Drawings.jpg |
| Clearway Drainage Survey - GF Plan Annotated Locations.pdf |
| Clearway Drainage Survey - Hepworth Arcade.pdf |
| Extract 1 1991 Link Works.jpg |
| Extract 2 1991 Link Works.jpg |
| Floor Duct Photo 1.jpg |
| Floor Duct Photo 18.jpg |
| Floor Duct Photo 19.jpg |
| Floor Duct Photo 2.jpg |
| Floor Duct Photo 21.jpg |
| Floor Duct Photo 22.jpg |
| Floor Duct Photo 25.JPG |
| Floor Duct Photo 26.JPG |
| Floor Duct Photo 27.JPG |
| Floor Duct Photo 28.JPG |
| Floor Duct Photo 29.JPG |
| Floor Duct Photo 3.jpg |
| Floor Duct Photo 30.JPG |
| GF Plan Extract Original Drawings.jpg |
| HEP000_Common Areas_ 2023.pdf |
| Please expand the document tree to the left to see docs.docx |
| SCHEDULE 2 - Social Benefit Outputs FINAL - 77548 FINAL ISSUED 241023.doc |
| Thumbs.db |
| Thumbs.db |
| Thumbs.db |