Publicly Available Documents | Size (kB) |
Only Available after Expression of Interest |
04.D.01 Instructions for Tendering v6 - Mercell.docx |
20897_H_DR_001_P1_Existing Plan Sections Elevation.pdf |
20897_H_DR_007_P1_Infill retention.pdf |
20897_H_DR_010_P2_Rebar anchoring.pdf |
20897_H_DR_010_P3_Rebar Anchors.pdf |
20897_H_DR_011_P1_Rebar Anchoring plan.pdf |
20897_H_DR_013_P1_Carriageway Replacement Wearing Course Reinstatement.pdf |
20897_H_DR_014_P1_Metalwork paint System plan.pdf |
20897-H-DR-001-P2 - Existing Plan, Sections & Elevation.pdf |
20897-H-DR-017-P1 - Repairs - Schedule of Works.pdf |
20897-H-DR-017-P2 - Schedule of Works.pdf |
20897-H-DR-020-C1 - Proposed VRS.pdf |
20897-H-RP-001-R0 Bubwith Bridge Specifications DA 23.5.23.docx |
20897-H-RP-003-R0 - Environmental Risk Assessment.pdf |
2Vz0q9DqK2f99y79wAG2.zip |
3765 Bubwith Bridge Heritage Statement_Compressed.pdf |
BT Bubwith.png |
Bubwith Bridge Ecology Report 2023.pdf |
C2613_01_Bubwith Location and Extents.pdf |
C2613_04.C.10 standard-return-slip-for-contractor.docx |
C2613_YC2.02.C.050_YORcivil2 Contract Data - NEC Main Form v6.docx |
CF Bubwith.pdf |
Diversion Route Plan_02.11.2022.pdf |
Existing Structure Information.zip |
KCOM Bubwith.pdf |
KCOM Letter.pdf |
KCOM Notice.pdf |
LineSearch Bubwith.PDF |
NGN Bubwith.pdf |
NPG Bubwith.pdf |
NPG Key.pdf |
NPG Letter.pdf |
NPG Letter.pdf |
PPIY_3765 BUBWITH BRIDGE SPECIFICATION.pdf |
Stamford Bridge BT.PNG |
Stamford Bridge CF.pdf |
Stamford Bridge KCOM.pdf |
Stamford Bridge LS.PDF |
Stamford Bridge NGN.pdf |
Stamford Bridge NPG.pdf |
YC2 Employment & Skills Spreadsheet v1.5.xlsx |