| Publicly Available Documents | Size (kB) |
| Only Available after Expression of Interest |
| 04.D.01 Instructions for Tendering v6 - Mercell.docx |
| 20897_H_DR_001_P1_Existing Plan Sections Elevation.pdf |
| 20897_H_DR_007_P1_Infill retention.pdf |
| 20897_H_DR_010_P2_Rebar anchoring.pdf |
| 20897_H_DR_010_P3_Rebar Anchors.pdf |
| 20897_H_DR_011_P1_Rebar Anchoring plan.pdf |
| 20897_H_DR_013_P1_Carriageway Replacement Wearing Course Reinstatement.pdf |
| 20897_H_DR_014_P1_Metalwork paint System plan.pdf |
| 20897-H-DR-001-P2 - Existing Plan, Sections & Elevation.pdf |
| 20897-H-DR-017-P1 - Repairs - Schedule of Works.pdf |
| 20897-H-DR-017-P2 - Schedule of Works.pdf |
| 20897-H-DR-020-C1 - Proposed VRS.pdf |
| 20897-H-RP-001-R0 Bubwith Bridge Specifications DA 23.5.23.docx |
| 20897-H-RP-003-R0 - Environmental Risk Assessment.pdf |
| 2Vz0q9DqK2f99y79wAG2.zip |
| 3765 Bubwith Bridge Heritage Statement_Compressed.pdf |
| BT Bubwith.png |
| Bubwith Bridge Ecology Report 2023.pdf |
| C2613_01_Bubwith Location and Extents.pdf |
| C2613_04.C.10 standard-return-slip-for-contractor.docx |
| C2613_YC2.02.C.050_YORcivil2 Contract Data - NEC Main Form v6.docx |
| CF Bubwith.pdf |
| Diversion Route Plan_02.11.2022.pdf |
| Existing Structure Information.zip |
| KCOM Bubwith.pdf |
| KCOM Letter.pdf |
| KCOM Notice.pdf |
| LineSearch Bubwith.PDF |
| NGN Bubwith.pdf |
| NPG Bubwith.pdf |
| NPG Key.pdf |
| NPG Letter.pdf |
| NPG Letter.pdf |
| PPIY_3765 BUBWITH BRIDGE SPECIFICATION.pdf |
| Stamford Bridge BT.PNG |
| Stamford Bridge CF.pdf |
| Stamford Bridge KCOM.pdf |
| Stamford Bridge LS.PDF |
| Stamford Bridge NGN.pdf |
| Stamford Bridge NPG.pdf |
| YC2 Employment & Skills Spreadsheet v1.5.xlsx |