Documents - Lot 64926:1 - School of Society and Culture Refurbishment Project Phase 2b
Publicly Available DocumentsSize (kB)
Only Available after Expression of Interest 
 ~$SC Phase 2b ITT.docx
 06501P - Transmittal Issue Sheet - Phase 2B.pdf
 06501P-SDS-B2-00-DR-E-7030-02_T01 - Card Office & RLB 001a.pdf
 06501P-SDS-B2-00-DR-E-7085-02_T01 - Card Office & RLB 001a.pdf
 06501P-SDS-B2-00-DR-M-6040-02_T01 - Card Office & RLB 001a.pdf
 06501P-SDS-B2-00-DR-M-6540-02_T01 - Card Office.pdf
 06501P-SDS-B3-03-DR-M-6040-03_T01 - Third Floor - Zone 1.pdf
 06501P-SDS-B3-03-DR-M-6040-04_T01 - Third Floor - Zone 2.pdf
 06501P-SDS-XX-XX-SH-M-6540-01_P01 - Schedule of Air Terminals and Diffusers.pdf
 06501P-SDS-XX-XX-SH-M-6565-01_P01 - Schedule of Volume Control Dampers.pdf
 06501P-SDS-XX-XX-SH-M-6567-03_P01 - Schedule of Cross Talk Attenuators.pdf
 06501P-SDS-XX-XX-SH-M-7060-02_P01 - Schedule of Radiators.pdf
 06501P-SDS-XX-XX-SH-M-7060-03_P01 - Schedule of Heat Pumps.pdf
 06501P-SDS-XX-XX-SP-M-XXXX-0002 Society & Culture Phase 1 MEP Brief Specification_T02.pdf
 06501P-SDS-Z1-03-DR-E-7010-03_T01 - Distribution Third Floor - Zone 1.pdf
 06501P-SDS-Z1-03-DR-E-7030-03_T01 - Third Floor - Zone 1.pdf
 06501P-SDS-Z1-03-DR-E-7085-03_T01 - Internal Lighting - Third Floor - Zone 1.pdf
 06501P-SDS-Z1-03-DR-M-6540-03_T01 - Third Floor - Zone 1.pdf
 06501P-SDS-Z2-03-DR-E-7010-04_T01 - Distribution Third Floor - Zone 2.pdf
 06501P-SDS-Z2-03-DR-E-7030-04_T01 - Third Floor - Zone 2.pdf
 06501P-SDS-Z2-03-DR-E-7085-04_T01 - Internal Lighting - Third Floor - Zone 2.pdf
 06501P-SDS-Z2-03-DR-M-6540-04_T01 - Third Floor - Zone 2.pdf
 10. Society and Culture - Phase 2b - Programme 12.12.22.pdf
 3.0 - Preliminaries and Contract Particulars - P2B CD Comments.docx
 6.0 - Work Schedule - (TENDERER TO COMPLETE) Phase 2b.doc
 7.0 - Cost Summary page (TENDERER TO COMPLETE).doc
 8.0 - Dayworks Schedule (TENDERER TO COMPLETE).docx
 Asset and Location Uploader Template Client.xlsx
 BE-COP-002 Legionella & Water Hygiene.docx
 BE-PLN-004 Water Safety Plan.docx
 BG 45-2013 How to Procure Soft Landings.pdf
 BG 61-2015 Soft Landings GSL.pdf
 BG27-2011 Pitstopping.pdf
 BG38-2012 Soft landings Core Principles.pdf
 BG4-2009 (soft landings framework).pdf
 Certification Required by Maintenance on PC.docx
 Contractor Compounds - A Guide for Contractors.docx
 Declaration of Good Standing Reg 57 September 2016.docx
 Draft-Legionella Sampling Protocol.docx
 Draft-Water Systems Design & Commissioning.docx
 Form of Tender.docx
 Handover & Acceptance Checklist Rev 1.docx
 KW212 Phase 2b - Drawing Issue Sheet.pdf
 KW212-2b-D01 - RLB Card Office Works.pdf
 KW212-2b-D02 - RLB Card Office Furniture Layout.pdf
 KW212-2b-D03 - RLB Card Office Proposed Floor Finish.pdf
 KW212-2b-D05 - Room 001A.pdf
 KW212-2b-D06 - Room 001A Proposed Floor Finish.pdf
 KW212-2b-D07 - Elevations of Room 001a.pdf
 KW212-2b-D08 - Third Floor Existing Floor Plan.pdf
 KW212-2b-D09 - Third Floor Proposed Floor Plan.pdf
 KW212-2b-D10 - Third Floor Proposed Furniture Layout.pdf
 KW212-2b-D11 - Demo & Strip out of Third Floor Rooms.pdf
 KW212-2b-D12 - Third Floor Proposed Ceiling Types.pdf
 KW212-2b-D13 - Third Floor Proposed Floor Types.pdf
 KW212-2b-D14 - Third Floor Partition Types.pdf
 KW212-2b-D15 - Door Schedule.xlsx
 Maintenance Bar Code Locations.docx
 Matteport Scans.msg
 Non Canvassing Certificate.docx
 Non Collusive Certificate.docx
 NUB-22762-LAY-001.pdf
 NUB-22762-LAY-002.pdf
 NUB-22762-LAY-003.pdf
 Pre Construction Information S&C Phase 2b FINAL.pdf
 Quality Quesitons.docx
 SoSC Phase 2b ITT.docx
 SoSC Phase 2b Tender Pack.zip
 TIS Infrastructure Design Specification V7.2.pdf
Print...Close window