Publicly Available Documents | Size (kB) |
Only Available after Expression of Interest |
~$SC Phase 2b ITT.docx |
06501P - Transmittal Issue Sheet - Phase 2B.pdf |
06501P-SDS-B2-00-DR-E-7030-02_T01 - Card Office & RLB 001a.pdf |
06501P-SDS-B2-00-DR-E-7085-02_T01 - Card Office & RLB 001a.pdf |
06501P-SDS-B2-00-DR-M-6040-02_T01 - Card Office & RLB 001a.pdf |
06501P-SDS-B2-00-DR-M-6540-02_T01 - Card Office.pdf |
06501P-SDS-B3-03-DR-M-6040-03_T01 - Third Floor - Zone 1.pdf |
06501P-SDS-B3-03-DR-M-6040-04_T01 - Third Floor - Zone 2.pdf |
06501P-SDS-XX-XX-SH-M-6540-01_P01 - Schedule of Air Terminals and Diffusers.pdf |
06501P-SDS-XX-XX-SH-M-6565-01_P01 - Schedule of Volume Control Dampers.pdf |
06501P-SDS-XX-XX-SH-M-6567-03_P01 - Schedule of Cross Talk Attenuators.pdf |
06501P-SDS-XX-XX-SH-M-7060-02_P01 - Schedule of Radiators.pdf |
06501P-SDS-XX-XX-SH-M-7060-03_P01 - Schedule of Heat Pumps.pdf |
06501P-SDS-XX-XX-SP-M-XXXX-0002 Society & Culture Phase 1 MEP Brief Specification_T02.pdf |
06501P-SDS-Z1-03-DR-E-7010-03_T01 - Distribution Third Floor - Zone 1.pdf |
06501P-SDS-Z1-03-DR-E-7030-03_T01 - Third Floor - Zone 1.pdf |
06501P-SDS-Z1-03-DR-E-7085-03_T01 - Internal Lighting - Third Floor - Zone 1.pdf |
06501P-SDS-Z1-03-DR-M-6540-03_T01 - Third Floor - Zone 1.pdf |
06501P-SDS-Z2-03-DR-E-7010-04_T01 - Distribution Third Floor - Zone 2.pdf |
06501P-SDS-Z2-03-DR-E-7030-04_T01 - Third Floor - Zone 2.pdf |
06501P-SDS-Z2-03-DR-E-7085-04_T01 - Internal Lighting - Third Floor - Zone 2.pdf |
06501P-SDS-Z2-03-DR-M-6540-04_T01 - Third Floor - Zone 2.pdf |
10. Society and Culture - Phase 2b - Programme 12.12.22.pdf |
3.0 - Preliminaries and Contract Particulars - P2B CD Comments.docx |
6.0 - Work Schedule - (TENDERER TO COMPLETE) Phase 2b.doc |
7.0 - Cost Summary page (TENDERER TO COMPLETE).doc |
8.0 - Dayworks Schedule (TENDERER TO COMPLETE).docx |
Asset and Location Uploader Template Client.xlsx |
BE-COP-002 Legionella & Water Hygiene.docx |
BE-PLN-004 Water Safety Plan.docx |
BG 45-2013 How to Procure Soft Landings.pdf |
BG 61-2015 Soft Landings GSL.pdf |
BG27-2011 Pitstopping.pdf |
BG38-2012 Soft landings Core Principles.pdf |
BG4-2009 (soft landings framework).pdf |
Certification Required by Maintenance on PC.docx |
Contractor Compounds - A Guide for Contractors.docx |
Declaration of Good Standing Reg 57 September 2016.docx |
Draft-Legionella Sampling Protocol.docx |
Draft-Water Systems Design & Commissioning.docx |
Form of Tender.docx |
Handover & Acceptance Checklist Rev 1.docx |
KW212 Phase 2b - Drawing Issue Sheet.pdf |
KW212-2b-D01 - RLB Card Office Works.pdf |
KW212-2b-D02 - RLB Card Office Furniture Layout.pdf |
KW212-2b-D03 - RLB Card Office Proposed Floor Finish.pdf |
KW212-2b-D05 - Room 001A.pdf |
KW212-2b-D06 - Room 001A Proposed Floor Finish.pdf |
KW212-2b-D07 - Elevations of Room 001a.pdf |
KW212-2b-D08 - Third Floor Existing Floor Plan.pdf |
KW212-2b-D09 - Third Floor Proposed Floor Plan.pdf |
KW212-2b-D10 - Third Floor Proposed Furniture Layout.pdf |
KW212-2b-D11 - Demo & Strip out of Third Floor Rooms.pdf |
KW212-2b-D12 - Third Floor Proposed Ceiling Types.pdf |
KW212-2b-D13 - Third Floor Proposed Floor Types.pdf |
KW212-2b-D14 - Third Floor Partition Types.pdf |
KW212-2b-D15 - Door Schedule.xlsx |
Maintenance Bar Code Locations.docx |
Matteport Scans.msg |
Non Canvassing Certificate.docx |
Non Collusive Certificate.docx |
NUB-22762-LAY-001.pdf |
NUB-22762-LAY-002.pdf |
NUB-22762-LAY-003.pdf |
Pre Construction Information S&C Phase 2b FINAL.pdf |
Quality Quesitons.docx |
SoSC Phase 2b ITT.docx |
SoSC Phase 2b Tender Pack.zip |
TIS Infrastructure Design Specification V7.2.pdf |