Documents - Lot 57200:1 - Replacement and Installation of Drill Towers at Training Hub, Thornaby, Billingham, Saltburn and Redcar Fire Stations.
Publicly Available DocumentsSize (kB)
Only Available after Expression of Interest 
 18308 Billingham Fire Station PEA Report V2.0.pdf
 18308 Billingham Fire Station PEA V1.0 issue.pdf
 18308A Thornaby Fire Station Tree Survey AIA V1.0.pdf
 18308B Billingham Fire Station Tree Survey AIA AMS V1.0.pdf
 2103.25.1201 T1 - QMC - Location Plan.pdf
 2103.25.1202 T1 - QMC - Ex Site Plan.pdf
 2103.25.1203 T1 - QMC - Pr Site Plan.pdf
 2103.25.1204 T1 - QMC - Cont Acc and Constraints Plan.pdf
 2103.25.1601 T1 - QMC - Pr Roof Training Rig.pdf
 2103.25.2201 T1 - REDCAR FS - Location Plan.pdf
 2103.25.2202 T1 - REDCAR FS - Ex Site Plan.pdf
 2103.25.2203 T1 - REDCAR FS - Pr Site Plan.pdf
 2103.25.2204 T1 - REDCAR FS - Cont Acc and Constraints Plan.pdf
 2103.25.2301 T1 - REDCAR FS - Ex Roof Plan.pdf
 2103.25.2302 T1 - REDCAR FS - Pr Roof Plan.pdf
 2103.25.2303 T1 - REDCAR FS - Pr Training Tower.pdf
 2103.25.2401 T1 - REDCAR FS - Ex Elevations Sht 1.pdf
 2103.25.2402 T1 - REDCAR FS - Ex Elevations Sht 2.pdf
 2103.25.2403 T1 - REDCAR FS - Pr Elevations Sht 1.pdf
 2103.25.2404 T1 - REDCAR FS - Pr Elevations Sht 2.pdf
 2103.25.2601 T1 - REDCAR FS - Pr Roof Detail.pdf
 2103.25.3201 T1 - BILLINGHAM FS - Location Plan.pdf
 2103.25.3202 T1 - BILLINGHAM FS - Ex Site Plan.pdf
 2103.25.3203 T1 - BILLINGHAM FS - Pr Site Plan.pdf
 2103.25.3204 T1 - BILLINGHAM FS - Cont Acc and Constraints Plan.pdf
 2103.25.3401 T1 - BILLINGHAM FS - Ex Elevations and Floor Plan.pdf
 2103.25.3402 T1 - BILLINGHAM FS - Ex Elevations - Training Bldg.pdf
 2103.25.3403 T1 - BILLINGHAM FS - Pr Elevations and Floor Plan.pdf
 2103.25.3404 T1 - BILLINGHAM FS - Pr Training Tower.pdf
 2103.25.3601 T1 - BILLINGHAM FS - Fence & Gate Detail.pdf
 2103.25.4201 T1 - THORNABY FS - Location Plan.pdf
 2103.25.4202 T1 - THORNABY FS - Existing Site Plan.pdf
 2103.25.4203 T1 - THORNABY FS - Proposed Site Plan.pdf
 2103.25.4204 T1 - THORNABY FS - Cont Acc and Constraints Plan.pdf
 2103.25.BILLI.100 T01 - Drill Tower Base.pdf
 2103.25.BILLI.101 T02 - Smoke House Demolition.pdf
 2103.25.BILLI.102 T01 - Oil Tank Base RC Details & Schedule.pdf
 2103.25.BILLI.PC01 - Pile cap bar bending schedule.pdf
 2103.25.QUEEN.100 T01 - Drill Tower Base.pdf
 2103.25.REDCA.100 T01 - Drill Tower Base.pdf
 2103.25.THORN.100 T01 - Drill Tower Base.pdf
 2103.25.THORN.PC01 - Pile cap bar bending schedule.pdf
 2103.26.100 T01 - Drill tower Base.pdf
 2103.26.201 T1 - SALTBURN FS - Location Plan.pdf
 2103.26.202 T1 - SALTBURN FS - Existing Site Plan.pdf
 2103.26.203 T1 - SALTBURN FS - Proposed Site Plan.pdf
 2103.26.204 T1 - SALTBURN FS - Cont Acc and Constraints Plan.pdf
 2103.26.301 T1 - SALTBURN FS - Twr Ex Plans & Elevs.pdf
 2103.26.303 T1 - SALTBURN FS - Twr Pr Plans & Elevs.pdf
 2195.08.4301 T1 - THORNABY FS - Existing Plans and Elevations.pdf
 2195.08.4302 T1 - THORNABY FS - Proposed Plans and Elevations.pdf
 22.05.13 - Planning Approval - REDCAR.pdf
 22.05.23 - Planning Approval - QMC.pdf
 22.06.06 - Planning Approval - THORNABY FS.pdf
 22.07.13 - Planning Approval.pdf
 4079 HQ P1 & P2 Investigation FINAL Nov 13.pdf
 A1 - CFB Drill Towers- ITT Front Cover & Flysheets V1.pdf
 A2 - CFB Drill Towers - Contract Preliminaries V1.pdf
 A3 - CFB Drill Towers - Schedule of Works V2.xlsx
 A4 - CFB Drill Towers - Form of Tender V1.docx
 Appendix G - Practical Completion Requirements.pdf
 Billingham Fire Station Seal Sands.pdf
 Billingham Smoke House R&D Survey 2021.pdf
 Billingham Tower R&D Survey 2021.pdf
 CFB additional policies.pdf
 CFB Drill Tower Replacements V05a 2022 07 30.pdf
 Desk Study Report - Billingham Community Fire Station.pdf
 Heritage Statement - SALTBURN FS.pdf
 Introduction.docx
 ITT.docx
 Phase 2 Site Investigation Report - Saltburn Fire Station.pdf
 Pre-Construction Information Pack - BILLINGHAM.pdf
 Pre-Construction Information Pack - QUEENS MEADOW.PDF
 Pre-Construction Information Pack - REDCAR.PDF
 Pre-Construction Information Pack - SALTBURN.pdf
 Pre-Construction Information Pack - THORNABY.pdf
 PROC-035-SOCVALCFB.xlsx
 Redcar Fire Station.pdf
 Redcar Tower R&D Survey 2021.pdf
 S220148 Phase 2 Site Investigation Billingham Fire Station.pdf
 Saltburn Fire Station Phase 1 DS.pdf
 Saltburn Fire Station.pdf
 SI Report Redcar Fire Station.pdf
 Thornaby Phase 1 2 SI Report March 2016.pdf
 Thornaby Tower R&D Survey 2021.pdf
Print...Close window