Publicly Available Documents | Size (kB) |
Only Available after Expression of Interest |
01008C - Roadworks Information Sign Board.pdf |
1. PAS91 2013 A1 2017 (1).pdf |
11008c PC Kerb Conc Timber Edge (1) Model (1).pdf |
2. PAS91- 2013 Table 13.docx |
20210825_105504.jpg |
20210825_105512.jpg |
20210825_105529.jpg |
20210825_105626.jpg |
20210825_105645.jpg |
20210825_105713.jpg |
20211130_144810.mp4 |
20211130_150504.mp4 |
20211130_151136.jpg |
20211130_151143.jpg |
20211130_151207.jpg |
20211130_151508.jpg |
20211130_151513.jpg |
362972788_ESP Utilities Group - Gas.pdf |
4. MINIMUM STANDARDS DECLARATIONS.pdf |
App 0-3 List of Appendices.pdf |
App 0-4 List of Contract Documents.pdf |
App 11-1 Kerbs Footways and Paved Areas.pdf |
App 1-12 Setting Out.pdf |
App 1-13 Programme of Works.pdf |
App 1-14 Payment Applications.pdf |
App 1-16 Services.pdf |
App 1-21 Information Boards.pdf |
App 1-5 Testing by Contractor.pdf |
App 1-7 Site Extents.pdf |
App 1-9 Noise and Vibration.pdf |
App 30-5 Grass Seeding and Turfing.pdf |
App 6-5 Geotextiles and Carriageway Reinforcement.pdf |
BT Map.png |
Certificate of Non Collusion.pdf |
CORE COMMERCIAL 65-30 Specification Sheet - Provisional Works.pdf |
CORE COMMERCIAL Installation Guide (SUDS Construction) - Provisional Works.pdf |
Hazard Inventory - From GEN 912 F1.pdf |
KCOM Map.png |
LGM E1295-0100-(A1 Layout).pdf |
LinesearchbeforeUdig.pdf |
LSBUD-210820-23043494.PDF |
NEC Short Contract Tender Instructions V3.1 Price Only _E1295 LGM.docx |
NEC Short Contract Tender Instructions V3.1 Price Only _E1295 LGM.pdf |
NEC Short Contract V4.3 E1295_LGM 18-01-22.docx |
NEC Short Contract V4.3 E1295_LGM 18-01-22.pdf |
NGN Map.pdf |
NPG Map.pdf |
Preconstruction Information-912-F1 Stats Protocol.pdf |
Render - Backgrounds.pdf |
Render - Detailing - NHBC Spec.pdf |
Render - Finishes - NHBC Spec.pdf |
Render - Mixes - NHBC Spec.pdf |
Render - Movement - NHBC Spec.pdf |
Render - Weather Conditions - NHBC Spec.pdf |
Site Extents.pdf |
STEP UNITS Installation - Conservation X.pdf |
Tender Clarification No.1_25.01.2022.pdf |
TimePhoto_20211004_115658.jpg |
TimePhoto_20211004_115735.jpg |
TimePhoto_20211004_115954.jpg |
YW Map.pdf |