Documents - Lot 37101:1 - COVID 19 MITIGATION FOR THE HEATING VENTILATION AND AIR CONDITIONING (HVAC) AT HQ, SAFESIDE AND HAYMIILS FIRE STATION
Publicly Available DocumentsSize (kB)
Appendix 1 -Tender Evaluation .docx75
Appendix 10 - AC 2000 O&M manual Safeside (2).zip26193
Appendix 11 - HQ and Safeside Air conditioning plans.zip26026
Appendix 12 - location for the split condenser units for Safeside.pdf306
Appendix 2A - Lot 1 Specification.pdf497
Appendix 2B -Lot 2 Specification.pdf519
Appendix 3A - Pricing schedule HQ and Safeside.docx22
Appendix 3B - Pricing Scheulde Hay Mills .docx31
Appendix 4A - HS Code for Contractors.docx78
Appendix 4B - Contractors health and safety induction 2020.ppt1220
Appendix 5 - Whistle Blowing Policy.pdf209
Appendix 6- Declaration .docx25
Appendix 7 - HQ Site drawings .zip42747
Appendix 8 Drawings for Hay Mill.zip2437
Appendix 9 - Hay Mills Asbestos Survey.pdf638
ITT - HVAC Covid Mitigation.docx127
Only Available after Expression of Interest 
Print...Close window