| Publicly Available Documents | Size (kB) |
| Only Available after Expression of Interest |
| 00001.avi |
| 00002.avi |
| 00003.avi |
| 00004.avi |
| 00005.avi |
| 00006.avi |
| 00007.avi |
| 00008.avi |
| 00009.avi |
| 17022 Specification for Structural Works.pdf |
| 17022-100A-GA and Sections.pdf |
| 17022-101B-External Ramp GA and Section.pdf |
| 17022-300A-Details.pdf |
| 5682 fdn (002).pdf |
| 9287-01.pdf |
| 9287-02.pdf |
| 9287-03.pdf |
| 9626.01 CDM Pre-Construction Information - 1.12.17.pdf |
| 992 Argyle Primary School - Tender Issue List of Information.pdf |
| 992 Argyle Primary School Specification 17-12-11.pdf |
| 992-CLTH-AA-00-DR-A-1001-Site_Constraints_Plan.pdf |
| 992-CLTH-AA-00-DR-A-2007-Existing_GF_Plan_Demolition_Rev_B.pdf |
| 992-CLTH-AA-00-DR-A-2014-Proposed_GF_Plan_Rev_D.pdf |
| 992-CLTH-AA-00-DR-A-6000-Proposed_Ramp_Rev_C.pdf |
| 992-CLTH-AA-00-DR-A-6001-Proposed_Reception_Desk_Rev_A.pdf |
| 992-CLTH-AA-01-DR-A-2008-Existing_FF_Plan_Demolition_Rev_B.pdf |
| 992-CLTH-AA-01-DR-A-2015-Proposed_FF_Plan_Rev_F.pdf |
| 992-CLTH-AA-01-DR-A-6002-Ceiling_Detail.pdf |
| 992-CLTH-AA-01-DR-A-6003-Kitchen_Units.pdf |
| 992-CLTH-AA-ZZ-DR-A-4020-Proposed_NW_Elevation_Rev_A.pdf |
| 992-CLTH-AA-ZZ-DR-A-4021-Proposed_NE_Elevation.pdf |
| 992-CLTH-AA-ZZ-DR-A-4022-Proposed_SE_Elevation.pdf |
| 992-CLTH-AA-ZZ-DR-A-4023-Proposed_SW_Elevation.pdf |
| 992-CLTH-AA-ZZ-DR-A-7001-GF_Room_Elevations_Rev_A.pdf |
| 992-CLTH-AA-ZZ-DR-A-7002-GF_Room_Elevation_Rev_A.pdf |
| 992-CLTH-AA-ZZ-DR-A-7003-FF_Room_Elevations_Rev_A.pdf |
| 992-CLTH-AA-ZZ-DR-A-7004-FF_Room_Elevations_Rev_A.pdf |
| 992-CLTH-AA-ZZ-DR-A-7005-WC_Room_Elevations_Rev_A.pdf |
| 992-CLTH-XX-00-DR-A-1000-Location_Plan_Rev_A.pdf |
| 992-CLTH-XX-00-SH-A-8003-GF_Flooring_Schedule.pdf |
| 992-CLTH-XX-01-DR-A-3000-First_Floor_RCP_Rev_A.pdf |
| 992-CLTH-XX-01-SH-A-8004-FF_Flooring_Schedule.pdf |
| 992-CLTH-XX-XX-SH-A-8000-External_Door_Schedule.pdf |
| 992-CLTH-XX-XX-SH-A-8002-Window_Schedule.pdf |
| Additional Conditions of Contract For.doc |
| Argyle Primary School Contract Work Schedules.pdf |
| Argyle Primary School Preliminaries.pdf |
| Argyle School STEM ITT 04122017.doc |
| Asbestos Management Report_March 2016.pdf |
| Being a Camden Supplier.docx |
| Contract Work Schedules and Specification 17-12-12.docx |
| E-Mail Correspondence From Boushra Taraza (CLTH) 23-11-17.pdf |
| E-Mail Correspondence From Paul Greatbatch (LBC) 03-11-17.pdf |
| E-Mail Correspondence From Paul Greatbatch (LBC) 16-11-17.pdf |
| F0102.SPC.001 - Mechanical and Public Health Services Performance Specification .pdf |
| F0102.SPC.002 Electrical Engineering Services Performance Specification.pdf |
| F0102_60_SH_01 - Distribution Board Schedule.pdf |
| F0102_63_SH_01 - Luminaire Schedule.pdf |
| F0102-E-(60)-01-T1.pdf |
| F0102-E-(60)-02-T1.pdf |
| F0102-E-(62)-01-T1.pdf |
| F0102-E-(62)-02-T1.pdf |
| F0102-E-(63)-01-T1.pdf |
| F0102-E-(63)-02-T1.pdf |
| F0102-E-(68)-01-T1.pdf |
| F0102-E-(68)-02-T1.pdf |
| F0102-M-(52)-01-T1.pdf |
| F0102-M-(53)-01-T1.pdf |
| F0102-M-(56)-01-T1.pdf |
| F0102-M-(56)-02 -T1.pdf |
| F0102-M-(56)-03-T1.pdf |
| F0102-M-(57)-01 -T1.pdf |
| F0102-ME-(00)-01-T1.pdf |
| F0102-ME-(00)-02-T1.pdf |