Documents - Lot 111851:1 - Stage 1 Refurbishment of Former Boots Building (Pharmacy Relocation)
Publicly Available DocumentsSize (kB)
Only Available after Expression of Interest 
 00.25064-ACE-P1-XX-D-S-0151-P1-General Notes.pdf
 00.25064-ACE-P1-ZZ-D-S-7000-P2-Masonry Restraint Details.pdf
 00.25064-ACE-ZZ-ZZ-D-C-1000-P3-Proposed Drainage Strategy.pdf
 00.25064-ACE-ZZ-ZZ-D-C-1030-P1-Private Drainage Details.pdf
 00.25064-ACE-ZZ-ZZ-L-Z-0001-Drawing Issue Sheet.pdf
 00.25064-ACE-ZZ-ZZ-L-Z-0002-Specification Issue List.pdf
 00.25064-ACE-ZZ-ZZ-T-C-0017-P01-Specification for Drainage Works.pdf
 00.25064-ACE-ZZ-ZZ-T-S-0001-P01-Specification for Minor Works.pdf
 00.25064-ACE-ZZ-ZZ-T-S-0002-P1-NSCS Specification for reinforced concrete.pdf
 00.25064-ACE-ZZ-ZZ-T-S-0004-P01-Specification for Masonry.pdf
 24-211 ITB Part 1 - Information and Instructions.docx
 24-211 ITB Part 3 - Bid Return Document - Schedule 8c - Social Value Delivery Plan.docx
 24-211 ITB Part 3 - Bid Return Document V2.docx
 25037r02.1 Abbey Pharmacy-Fire Strategy Report_250924.pdf
 3577-SDA-50-ZZ-SP-M-00401.pdf
 3577-SDA-52-00-DR-P-00401.pdf
 3577-SDA-53-00-DR-P-00401.pdf
 3577-SDA-56-00-DR-M-00401.pdf
 3577-SDA-57-00-DR-M-00401.pdf
 3577-SDA-60-ZZ-SP-E-00401.pdf
 3577-SDA-61-ZZ-DR-E-00401.pdf
 3577-SDA-61-ZZ-DR-E-00402.pdf
 3577-SDA-62-ZZ-DR-E-00401.pdf
 3577-SDA-63-00-DR-E-00401.pdf
 3577-SDA-68-ZZ-DR-E-00401.pdf
 3577-SDA-XX-XX-RG-ME-00401_Designer's Risk Register.pdf
 3577-SDA-XX-XX-TL-ME-00401.pdf
 74781-rmbc---cdc-&-health-hub---phase-1-works-(int)_B(1).pdf
 Howard Street - PCIP.docx
 RMBC-AHR-20-P1-00-D-A-20000_P3 - Existing Ground Floor Plan.pdf
 RMBC-AHR-20-P1-00-D-A-20025_P7 - Proposed Ground Floor Plan (Abbey Pharmacy).pdf
 RMBC-AHR-20-P1-00-D-A-20035_P2 - Demolition & Proposed Scoping Plans.pdf
 RMBC-AHR-20-P1-01-D-A-20001_P3 - Existing First Floor Plan.pdf
 RMBC-AHR-20-P1-02-D-A-20002_P3 - Existing Second Floor Plan.pdf
 RMBC-AHR-20-P1-RF-D-A-20027_P2 - Proposed Roof Plan.pdf
 RMBC-AHR-20-P1-ZZ-D-A-20036_P2 - Existing, Demo & Proposed Elevations.pdf
 RMBC-AHR-20-P1-ZZ-D-A-20220_P2 - Proposed Sections.pdf
 RMBC-AHR-21-P1-ZZ-D-A-21001_P1 - Proposed Shopfront Elevations & Sections.pdf
 RMBC-AHR-22-P1-00-D-A-22001_P1 - Ground Floor Partition Types & Pattress Requirements.pdf
 RMBC-AHR-30-P1-00-D-A-30001_P2 - Door Functions Plan.pdf
 RMBC-AHR-31-P1-ZZ-D-A-31001_P2 - External Doors & Louvres.pdf
 RMBC-AHR-32-P1-ZZ-D-A-32001_P2 - Internal Doors - Types, Schedule & Details.pdf
 RMBC-AHR-35-P1-00-D-A-35001_P1 - Ground Floor Reflected Ceiling Plan.pdf
 RMBC-AHR-40-P1-00-D-A-40001_P2 - Ground Floor Finishes Plan.pdf
 RMBC-AHR-42-P1-00-D-A-42001_P2 - Ground Floor Acoustic Strategy.pdf
 RMBC-AHR-67-P1-00-D-A-67001_P2 - Ground Floor Fire Strategy.pdf
 RMBC-AHR-70-P1-00-D-A-70001_P3 - Proposed Ground Floor FF&E Layout.pdf
 RMBC-AHR-70-P1-00-D-A-70002_P2 - Staff Area Kitchenette - Setting Out.pdf
 RMBC-AHR-70-P1-00-D-A-70003_P2 - Proposed FF&E - Setting Out.pdf
 RMBC-AHR-70-P1-00-D-A-70010_P3 - Existing Abbey Pharmacy Inventory.pdf
 RMBC-AHR-71-P1-00-D-A-71001_P2 - Internal Signage.pdf
 RMBC-AHR-71-P1-ZZ-D-A-71101_P2 - External Signage.pdf
 RMBC-AHR-74-P1-00-D-A-74001_P2 - Accessible WC Layout.pdf
 RMBC-AHR-95-P1-ZZ-D-A-95001_P2 - CDM Hazards %2F Access & Maintenance Strategy.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_25_10_30_35_P01 - Gypsum board partition systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_25_13_50_56_P01 - Masonry internal partition systems - plaster-lined (single side).pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_25_25_45_35_P01 - Gypsum board wall lining systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_25_25_75_63_P02 - Plastics panel lining systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_25_30_20_25_P01 - Internal doorset systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_25_30_20_74_P01 - Roller shutter doorset systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_25_30_95_96_P01 - Window Wall Systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_25_60_30_40_P01 - Individual services penetrations fire stopping systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_25_60_30_55_P01 - Multiple services penetrations fire stopping systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_25_60_30_62_P01 - Pipe collar fire-stopping systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_30_25_10_28_P01 - External soffit systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_30_25_10_35_P01 - Gypsum board suspended ceiling systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_30_25_10_80_P01 - Soffit lining and beam casing systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_30_25_22_90_P01 - Unit modular suspended ceiling systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_30_42_15_10_P01 - Bonded or partially bonded cementitious levelling screed systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_30_42_30_30_P01 - Floor coating systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_30_42_32_30_P01 - External floor tiling systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_30_42_72_72_P01 - Resilient sheet floor covering systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_30_60_30_26_P01 - Entrance barrier matting systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_40_10_25_25_P01 - Electrical external signage systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_40_10_30_75_P01 - Safety signage systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_40_10_35_10_P01 - Building signage systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_40_10_40_30_P01 - Fixed internal architectural signage systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_40_15_35_50_P01 - Minor joinery systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_40_15_75_02_P01 - Accessible WC package systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_40_15_75_92_P01 - Washbasin systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_40_45_37_45_P01 - Kitchen FFE systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_40_50_50_50_P01 - Medical and dental surgery FFE systems.pdf
 RMBC-AHR-XX-P1-XX-SP-A-Ss_40_90_60_95_P01 - Waterborne paint systems.pdf
 Transmittal - 00027.pdf
 YORbuild3 Employment and Skills Plan.xlsx
Print...Close window